Made a bit more progress on this, starting with the upper wing center section and gravity fuel tank. The overhead gauges and fuel lines were added:

The center section was then added to the cabanes using 5 Minute Epoxy to allow for some adjustment time. You can see I got a slight bend in one of the rear "wishbone" struts that supports the center section but I've decided to not tempt fate and just live with it.



The rigging for that portion was then completed; it was a bit of a test to get at the eyelets around the fuel tank.

Next the lower wings were added, the jig provided a nice way to ensure the proper and even dihedral resulted on the wings.


The lower wings had been pre-rigged so now I'll be installing the interplane struts and upper wing panels followed by the main rigging. I can see the completed benchmark not too far in the distance now!
Cheers,
Lance