Thank you, Jeroen.
Some progress with preparation of engine bits. Started with the carburettor parts, which have a plastic connection between carb pairs, that should not be there - I managed to remove most of it, also a funny post on which they were supposed to stand was removed. Bits of the posts were inserted into the holes in the engine block, sanded flush now. Also those round inspection holes in the engine front are done.


Oil tank equipped with two outlets and the drain pipe.

Oil filter has two funny pipes attached, which have little to do with reality. Those were cut off and correct pipes will be attached later, from a soldering wire.

Magnetos armed with 12 electric wires each, held together in 6s by bands. There will be some more of such bands added later.

Exhausts cleaned from flash and outlets drilled open.

And cylinder blocks glued together. Here I still hope to replace those tiny blobs imitating spark plugs with something from the wide offer from Taurus.
