Thank you, gentlemen.
And some more progress, slowly but still crawling forward.
The turnbuckles were tied to the kit PE fittings using loops of copper 0.07mm wire secured with CA glue
1) lower stations at interplane struts

2) upper stations for cabane rigging

3) lower fittings at wing roots


With this the wings could be attached for good

And the undercarriage done


In the last photo are just visible 16 PE fasteners added to the chin cowls - those from some spares, unfortunately not included in the kit.
And the silver painted fittings now ready to be glued to the fuselage
