Hi all,
Rigging has started now.
Difficult to make out some of the rigging as I had to tie back the flight control lines as they were getting in the way.
So far:
Double bracing across the top of the fuel tank.
Double bracing across the underside of the cockpit floor (2 sets).
Double bracing across the frame bays adjacent to the pilot's seat.
Double bracing across the rear of the pilot's seat support frame.
Double bracing across each vertical fuselage frame.
Done with 0.08 mm Mono-filament, 0.4 mm Nickel-Silver tube and 1:48th scale turnbuckles ('Gaspatch').
The same needs to done on each of the frame bays on each side of the fuselage as well as those under and on top of the fuselage.
Mike



